Distribution Center Upgrade in 72 Hrs.
A 907,000 square-foot retail store distribution center based in Iowa needed their two sorters with a combined length of 600 feet and 40 diverts rebuilt – and they needed it done fast...
Fabrication
JIC fabricated and installed a new soup processing line in 10 weeks for the world's sixth largest food company.
Fabrication and Installation Excellence
JIC converted an existing warehouse facility into a cocoa powder production plant on time and on budget.
Equipment Failure Emergency Support
After a fire, the JIC team made critical repairs at a snack manufacturing company over a weekend, allowing business to resume as usual on Monday.


 
















 

 

     
OEM Turnkey-Safety Training
When JIC was hired by the world's largest tea manufacturer to replace their old equipment, safety was the number one priority, and employees were given a full day of rigorous safety training. JIC was able to complete this complex job 1 1/2 days ahead of schedule, despite a tight time line.


 
 
   
 